FULFILLMENT DIVISION

CAPABILITIES & SERVICES

Sureway’s goal is to increase client’s profitability by providing efficient and cost effective value-added distribution and fulfillment services. Our mission is to run your project as efficiently as possible to meet deadlines and achieve budget objectives.

  • Display assembly
  • Sample assembly
  • Sealing / bagging
  • Cartoning / bundling /collating
  • Pick n pack
  • Sorting, palletizing
  • Stretch wrapping
  • Kitting / gluing / labeling
  • Secure room with controlled access.

  • Inventory Reporting
    1. Using online resources to capture quantities and QC
      information allows mobile entry from any hand held
      device or computer.
  • Production Tracking
    1. Using the same online resource production is being tracked daily.
  • Shipment Tracking
    1. Sureway ships merchandise all over the world and
      accommodates our clients with foresight and experience.

    1950 N. MANNHEIM ROAD

    Fulfillment Building 2

    Fulfillment Building Inside 1

    Building Specs

    •  64,000 sq. ft.
    •  8 Docks
    • 1 Drive-in Dock
    • Fenced Secure Storage Area
    • Fenced trailer parking
    • 6,000 sq. ft. of office space

    Security

    •  Motion sensor cameras throughout building
    •  Fenced-in secured trailer parking
    • Alarm system tied to local police and key Sureway employees for quick response
    • Secure room with limited access for sensitive projects and inventory

    Being Green

    •  All LED light fixtures throughout
    •  Working towards LEED Certification
    • New roof with 2” of insulation
    • New windows
      • Double pane thermal insulated office windows
      • Glass block warehouse windows
    • New Insulated overhead doors
    • New higher efficiency HVAC system
    • Recycling all refuse materials

    Office Space

    Conference Room

    exercise-room

    Jon's office

    exercise-room

    • Modern conference room
    • Private work spaces for visiting customers
    • Exercise room
    • Wi-Fi throughout

    THE TRANSITION

    Sureway Fulfillment Division Information

    Before

      • Outdated electrical wiring throughout
      • Outdated HVAC system
      • Old / damaged windows throughout
      • Uneven / damaged flooring
      • No drive-in garage access
      • Poorly insulated roof
      • Inefficient ventilation

    Sureway Fulfillment Division Information2

    After

    • Cleaned & painted ceilings and walls
    • Repaired and epoxy coated floors
    • Installed new high efficiency HVAC System
    • Added LED lighting throughout
    • Replaced all exterior windows
    • Upgraded electrical throughout
    • Added power to more locations in the plant
    • Installed compressed air lines
    • Installed new 30 HP Ingersoll Rand air compressor
    • Remodeled conference room
    • Replaced roof
    • Added a Fitness Room
    • Added additional areas for storage

    Sureway Fulfillment Division Information

    Article

    • Acquisition of building was recently
      featured in an article written by RE
      Journals
    • Article can be found at the link
      below

      Click here

    MEET THE TEAM

    Fulfillment Division